V7-7D17D8-207
MICRO SWITCH™ Miniature Basic Switches: V7 Series, Single Pole Double Throw (SPDT), 1 A 125 Vac, Gold-Plated Contacts, 34 mm [1.34 in] Roller Lever Actuator, 141,7 g [5 oz] Maximum Operating Force, 2,9 mm [0.11 in] Mounting Holes, -40 °C to 85 °C [-40 °F to 185 °F] Temperature Range, 4,75 mm x 0,51 mm [0.187 in x 0.02 in] Quick Connect Termination, UL, CSA ...
描述
A Snap Action Switch is a type of momentary contact micro switch which operates at rapid speed as it takes very little force or stimulus to operate. These highly sensitive switches are very often used as sensors in automotive, industrial and mechanical instruments. They are also used in timing devices, vending machines, computer and business equipment, test instruments, HVAC equipment, office equipment, manually operated devices, valves, gaming equipment and pressure switches.
V7-7D17D8-207 Snap Action Switch comes with world-wide package size acceptance and features a current rating ranging from 0.1 A to 25 A. V7-7D17D8-207 Snap Action Switch from Honeywell is specially designed for 100K operations at a full load and has a long mechanical life of up to 10M. This Honeywell switch is best suited for higher cost-of-failure applications.
产品亮点:
- World-wide package size acceptance
- Best suited for higher cost-of-failure applications
- UL/CSA and ENEC approvals
- Designed for 100K operations at a full load or 10M for mechanical life
- Current rating ranges from 0.1 A to 25 A
潜在应用:
- Appliances
- Vending machines
- Timing devices
- Office equipment
- Computer/business equipment
- Test instruments
- Medical/dental equipment
- Communications equipment
- HVAC equipment
- Manually operated devices
- Valves
- Gaming equipment
- Pressure switches
搜索关键词: V77D17D8207
规格
常见问题
V7-7D17D8-207 是否已停产?
是的,Honeywell 的 V7-7D17D8-207 已停产(生命周期结束时间:一月 2017)。Master Electronics 是授权分销商,可能仍有剩余库存或可提供推荐的替代产品。
V7-7D17D8-207 是否符合 RoHS 标准?
是的,V7-7D17D8-207 符合 RoHS 标准。
V7-7D17D8-207 的交货期是多少?
V7-7D17D8-207 的标准交货期约为 4 周。有库存的数量由 Master Electronics 发货。
有存货: 3,303
可立即发货
库存数量的起订量: 5
缺货数量的起订量: 50
工厂交货期 4 周
English
中文 / 汉语
Deutsch
Español
Nederlands
