DESCRIPCIÓN
Palabras clave de búsqueda: ADP24F292M
ESPECIFICACIONES
FREQUENTLY ASKED QUESTIONS
Is ADP-2.4F-2.92M RoHS compliant?
Yes, ADP-2.4F-2.92M is RoHS compliant.
What is the lead time for ADP-2.4F-2.92M?
The standard lead time for ADP-2.4F-2.92M is approximately 5 days. In-stock quantities ship from Master Electronics.
EN STOCK: 117
Envío today, Introduzca el valor de la configuración.
MOQ para cantidad agotada: 25
Plazo de entrega de fábrica 5 Semanas
English
中文 / 汉语
Español
