PDP-30
3 Position, 7.5 A, Vertical, Plug, Power DIN Connector
DESCRIPCIÓN
3 Position, 7.5 A, Vertical, Plug, Power DIN Connector
Palabras clave de búsqueda: PDP30
ESPECIFICACIONES
FREQUENTLY ASKED QUESTIONS
Is PDP-30 RoHS compliant?
Yes, PDP-30 is RoHS compliant.
What is the lead time for PDP-30?
The standard lead time for PDP-30 is approximately 6 days. In-stock quantities ship from Master Electronics.
EN STOCK: 2.498
Envío today, Introduzca el valor de la configuración.
Cantidad mínima de pedido: 10
Plazo de entrega de fábrica 6 Semanas
Precio (USD)
Cambios del producto
English
中文 / 汉语
Español
