SFPK-SL-TR
SFP+ Cage and Connector Kit
DESCRIPCIÓN
SFP+ Cage and Connector Kit
Palabras clave de búsqueda: SFPKSLTR
ESPECIFICACIONES
FREQUENTLY ASKED QUESTIONS
Is SFPK-SL-TR RoHS compliant?
Yes, SFPK-SL-TR is RoHS compliant.
What is the lead time for SFPK-SL-TR?
The standard lead time for SFPK-SL-TR is approximately 2 days. In-stock quantities ship from Master Electronics.
EN STOCK: 1.468
Envío today, Introduzca el valor de la configuración.
Cantidad mínima de pedido: 5
Plazo de entrega de fábrica 2 Semanas
Precio (USD)
Guías de productos
English
中文 / 汉语
Español
