4400-000LF
Feed Through Capacitor
DESCRIPCIÓN
Feed Through Capacitor
Palabras clave de búsqueda: 4400000LF
ESPECIFICACIONES
FREQUENTLY ASKED QUESTIONS
Is 4400-000LF RoHS compliant?
Yes, 4400-000LF is RoHS compliant.
What is the lead time for 4400-000LF?
The standard lead time for 4400-000LF is approximately 16 days. In-stock quantities ship from Master Electronics.
EN STOCK: 908
Envío today, Introduzca el valor de la configuración.
MOQ para cantidad agotada: 25
Plazo de entrega de fábrica 16 Semanas
Precio (USD)
Guías de productos
English
中文 / 汉语
Español
