D-SCE-1K-6.4-50-S1-2-CS876
Marker Sleeve Thin Wall 2: 1 Shrink Ratio Cross-Linked Polyolefin Red
DESCRIPTION
Marker Sleeve Thin Wall 2: 1 Shrink Ratio Cross-Linked Polyolefin Red
Search Keywords: DSCE1K6450S12CS876
SPECIFICATIONS
FREQUENTLY ASKED QUESTIONS
Is D-SCE-1K-6.4-50-S1-2-CS876 RoHS compliant?
Yes, D-SCE-1K-6.4-50-S1-2-CS876 is RoHS compliant.
What is the lead time for D-SCE-1K-6.4-50-S1-2-CS876?
The standard lead time for D-SCE-1K-6.4-50-S1-2-CS876 is approximately 9 weeks. In-stock quantities ship from Master Electronics.
IN STOCK: 5,500
Can Ship immediately
Minimum Order Quantity: 250
Factory Lead-Time 9 Weeks
English
中文 / 汉语
Deutsch
Español
Nederlands
