CB-CE01-18B-E
220-230V Power Cable For Pw-4007-Ec-E (Euro), To Be Used w/
DESCRIPTION
220-230V Power Cable For Pw-4007-Ec-E (Euro), To Be Used w/
Search Keywords: CBCE0118BE
SPECIFICATIONS
FREQUENTLY ASKED QUESTIONS
Is CB-CE01-18B-E RoHS compliant?
Yes, CB-CE01-18B-E is RoHS compliant.
What is the lead time for CB-CE01-18B-E?
The standard lead time for CB-CE01-18B-E is approximately 18 weeks. In-stock quantities ship from Master Electronics.
IN STOCK: 94
Ships today, if you order in
Minimum Order Quantity: 10
Multiple: 10
Factory Lead-Time 18 Weeks
Important Notice: SEIKO INSTRUMENTS products cannot be sold or shipped outside of the Americas.
English
中文 / 汉语
Deutsch
Español
Nederlands
