PSL-1019
Lockout Tagout, Tab tag, 'DANGER LOCKED OUT DO NOT OPERATE' (legend). | Panduit PSL-1019
DESCRIPTION
Lockout Tagout, Tab tag, 'DANGER LOCKED OUT DO NOT OPERATE' (legend).
Search Keywords: PSL1019
SPECIFICATIONS
FREQUENTLY ASKED QUESTIONS
Is PSL-1019 RoHS compliant?
Yes, PSL-1019 is RoHS compliant.
What is the lead time for PSL-1019?
The standard lead time for PSL-1019 is approximately 8 days. In-stock quantities ship from Master Electronics.
IN STOCK: 0 Packages
Minimum Order Quantity: 10 Packages
Multiple: 10 Packages
Factory Lead-Time 8 Weeks
English
中文 / 汉语
Deutsch
Español
Nederlands
