NCP45560IMNTWG-L
Load Switch, Integrated, ecoSwitch™, 23 A
DESCRIPTION
Load Switch, Integrated, ecoSwitch™, 23 A
Search Keywords: NCP45560IMNTWGL
SPECIFICATIONS
FREQUENTLY ASKED QUESTIONS
Is NCP45560IMNTWG-L RoHS compliant?
Yes, NCP45560IMNTWG-L is RoHS compliant.
What is the lead time for NCP45560IMNTWG-L?
The standard lead time for NCP45560IMNTWG-L is approximately 26 days. In-stock quantities ship from Master Electronics.
IN STOCK: 0
Manufacturer Stock: 27,000 can ship 9/18/26
Minimum Order Quantity: 25
Factory Lead-Time 26 Weeks can ship 3/8/27
English
中文 / 汉语
Deutsch
Español
Nederlands
