NCP45524IMNTWG-H
Load Switch, Integrated, ecoSwitch™, 6.0 A
DESCRIPTION
Load Switch, Integrated, ecoSwitch™, 6.0 A
Search Keywords: NCP45524IMNTWGH
SPECIFICATIONS
FREQUENTLY ASKED QUESTIONS
Is NCP45524IMNTWG-H RoHS compliant?
Yes, NCP45524IMNTWG-H is RoHS compliant.
What is the lead time for NCP45524IMNTWG-H?
The standard lead time for NCP45524IMNTWG-H is approximately 26 days. In-stock quantities ship from Master Electronics.
IN STOCK: 0
Minimum Order Quantity: 50
Factory Lead-Time 26 Weeks
English
中文 / 汉语
Deutsch
Español
Nederlands
